Changing the way of manufacturing from beginning to finishing.

No rust problem. No weld failure. No bonding failure since 1998.

Eliminates a lot of steps from Metal Surface Preparation

Removes Surface Rust. Years of Indoor Rust Protection

Prepares the metal surface Rust/contamination free 

for Priming, Painting, Powder Coating, Electrostatic Painting,

High Temperature Coating (Epoxy, Ceramic etc.)

IMAGINE A PRODUCT THAT REDUCES LABOR, TIME & COST SO MUCH,
THAT YOU GET MORE THAN YOUR MONEY BACK AFTER USE!!!

Therefore, the Payback is immediately after using the Product

(with more money back, depending on how many steps are eliminated)

ZERO PRODUCT COST AFTER USE

By Eliminating one or more Traditional steps

 Complete Green Process

The Picklex 20 Green Manufacturing Process results in zero waste disposal. The product reduces the welding and adhesion (bonding) failures to zero in the manufacturing/metal fabricating processes, eliminating re-work.

More Technical Info 

Save Labor, Time, Cost & Energy

Saves a lot of conventional steps, labor, time, cost & energy (around 50% to over 80% depending on the number of applications). Product costs comes out to be few cents per sq. ft. of metal surface along with couple of minutes of labor time.

Watch It Work 

Award-Winning Technology

Picklex® 20 is the only pre-treatment (conversion coating) which can be brushed on a metal surface at room temperature without rinsing and completely removes the oxidation from the metal surface, provides a Conversion coating, Seals the coating and stops the oxidation process, all in One Step.

View Awards